After 28 days concrete is considered to have gone through the optimal amount of time to cure and set. After this optimal duration concrete has been tested to have compression strength of 25 N/mm – hence the m25 refers to a ‘grade’ of concrete strength.
Visit https://concretersauckland.net.nz